Posted on March 26, 2025
Floor Sanding Blogs

Areas:
Ground floor: 20.82 m2
First floor: 20.26 m2
Time taken:
4 Days
The first thing we did was address the major repair by supplying and fitting a joist to the ground floor under the stairs and fill with boards area of 2.70 m x 0.70 m. The boards had to be turned in order to match the rest of the room’s existing pattern.
We also supplied and fitted approximately 10 linear meters of new floorboards to replace the extensively damaged ones.
For the remaining floorboards, there were minor repairs such as nailing them down. After this was finished and the surface was level, we were able to begin sanding. Remaining small gaps were filled with a slivers and resin mix.
To finish, the floors were coated with one layer of primer and two layers of solid white floor paint.